• American Tin Ceilings American Tin Cellings Pattern #1 24 x 24 inch Metal Tin Nail-Up Ceiling Tiles (Set of 5) (Covers 20 sq. ft) (Set of 5)
1 / 35

American Tin Ceilings American Tin Cellings Pattern #1 24 x 24 inch Metal Tin Nail-Up Ceiling Tiles (Set of 5) (Covers 20 sq. ft) (Set of 5)

$98.57
$4.79
-95%
Find dupes

Product details

Elevate your space with these stunning 24 x 24 inch metal tin ceiling tiles. Featuring a bright white satin finish and a modern geometric pattern, these tiles add dramatic three-dimensional depth to any ceiling or accent wall. Rust and heat resistant, they offer both durability and style.

Specifications

Dimensions

Length:24 in
Height:24 in
Width:24 in
Weight:10 lb

Product details

Elevate your space with these stunning 24 x 24 inch metal tin ceiling tiles. Featuring a bright white satin finish and a modern geometric pattern, these tiles add dramatic three-dimensional depth to any ceiling or accent wall. Rust and heat resistant, they offer both durability and style.

Specifications

Dimensions

Length:24 in
Height:24 in
Width:24 in
Weight:10 lb

American Tin Ceilings American Tin Cellings Pattern #1 24 x 24 inch Metal Tin Nail-Up Ceiling Tiles (Set of 5) (Covers 20 sq. ft) (Set of 5)

$98.57
$4.79
95% less
Prices updated 23 days ago 
Wayfair logo
Wayfair
American Tin Ceilings American Tin Cellings Pattern #1 24 x 24 inch Metal Tin Nail-Up Ceiling Tiles (Set of 5) (Covers 20 sq. ft) (Set of 5)
$4.79 
L
Lowe's
American Tin Ceilings 2-ft x 2-ft Bright White Satin Steel Surface-mount Ceiling Tile ( 5 -Pack, 20-sq ft / Case )
$98.57 
Home Depot logo
Home Depot
Pattern #1 in Bright White Satin 2 ft. x 2 ft. Nail Up Tin Ceiling Tile (20 sq. ft./Case)
$98.57 

You may also like

Looking for something similar? Check out these products.

Overview

We found this at three stores including Lowe's and Home DepotThis product sells from $4.79 up to $98.57. Users can save 95% by shopping at Wayfair.

This is the lowest price we've seen, typically ranging from $28 to $75.

This product is also marketed as the 

American Tin Ceilings American Tin Cellings Pattern #1 24 x 24 inch Metal Tin Nail-Up Ceiling Tiles (Set of 5) (Covers 20 sq. ft) (Set of 5) at Wayfair

,

American Tin Ceilings 2-ft x 2-ft Bright White Satin Steel Surface-mount Ceiling Tile ( 5 -Pack, 20-sq ft / Case ) at Lowe's

,

Pattern #1 in Bright White Satin 2 ft. x 2 ft. Nail Up Tin Ceiling Tile (20 sq. ft./Case) at Home Depot

.

Stores offered